Quality
Meeting quality and compliance requirements within budget and timing remain a major challenge: Kairnial helps you achieve them.

Ephemeral architecture
In 2024, Paris, home to the Eiffel Tower (built in two years for the 1889 World’s Fair in Paris...

Construction generates 75% of waste : it’s time to act
The construction sector accounts for the most waste produced in France: 75% to be precise. That...

What is EDM?
The EDM, or Electronic Document Management, is an environment consisting of a tool or several t...

Factor in the circular economy when renovating buildings
Thanks to the circular economy, it is now possible to produce sustainable goods while limiting ...

Construction 4.0 : the new revolution of the construction industry
So recent is the concept of Construction 4.0 that there is still no consensus over its definiti...

Ensuring staff safety on construction sites
According to IRIS-ST, an accident occurs every two minutes on every working day on a constructi...

Where do we stand with off-site construction?
Off-site construction is often presented as an innovative solution, the "Future" of the constru...

The main impacts of the RE 2022 on construction projects
The entry into force of the RE 2022 (Environmental Regulation 2022) on 1 January of this year f...

From RT 1974 to RE 2022, 50 years of building standards
Postponed for two years, RE 2020, which became RE 2022, finally came into force on 1 January 20...

5 tips for successfully digitising the design of a structure
Building a structure is an ambitious project which requires the implementation of project manag...

Resolve your defects with a straightforward collaborative tool!
In response to private and public stakeholders’ requirements and amid technological development...